“Congratulations, everyone is going to build for their family.” Currently the return of building permits with new conditions + the option not to sell. Quickly view the details.

The return of building permits in Egypt. In recent times, there has been great concern among citizens about the moratorium on buildings, which has prevented many people from building construction projects or wanting to build an upper floor in the house they live in, but there is news indicating that construction will return again and open the door to permits will be opened. Once again in towns and cities and under certain conditions we will clarify through the article all matters related to the return of construction.
Obtain building permits in cities and towns without any requirements
To obtain a building permit, you must follow the following steps to obtain permits, they are as follows:
If there is vacancy, the permit application will be submitted. An application is submitted for raising the floor of a constructed home. The location of the plot is then determined on the map under the supervision of the specialist in the village council. The value of the fees for determining the suitability of the location is determined by the municipality, and then the number is determined. The floors allowed by the municipality are determined based on the width of the street. To prepare the technical drawings, one must go to the engineering office and submit a power of attorney to the engineering office or to the official to complete the procedures. The contract of sale is signed and presented to the Council with a copy to be submitted. The copy is then made and the original delivered to the landowner.
Building permit costs for towns and cities
Many people do not know the value of the fees associated with building permits in the village, so in this section we explain the value of the fees that will be paid when applying for a building permit. The value of the fees is estimated as follows:
The allowances allocated for the social insurance premium amount to 2.5% and are calculated on the basis of the construction costs, but are determined under the supervision of the specialized engineer responsible for this, in addition to paying capacity improvement allowances, which are estimated at 20 pounds per meter. land area or ground floor area. The village council also determines the so-called technical stamps, the value of which is approximately 700 Egyptian pounds. There is also the issuance of a certificate of variable area, but based on the area, 200 pounds, and the provision of a certificate of construction supervision and a contract. Whoever wants to build must keep all paid receipts until they are submitted to the papers requested from the applicant under Applying for permits.